How to Select Crushing, Screening and Concrete Plants for Africa & Middle East Projects
Mining, infrastructure and construction projects in Africa and the Middle East operate under conditions that are significantly different from Europe. Extreme climate, abrasive materials and challenging site logistics require specially engineered crushing, screening, concrete and asphalt plants.
At Minevate, we design plant configurations that deliver high productivity, low operating cost and long service life, even under the harshest site conditions.
1. How Regional Conditions Affect Plant Selection
✔ Extreme Heat and Dust
Operating temperatures exceeding 45–50°C
Heavy dust exposure
➡️ Plants must be equipped with heavy-duty crushers, reinforced bearings and IP-protected automation systems.
✔ Hard and Abrasive Raw Materials
Basalt, granite, high-silica aggregates
High wear rates if equipment is incorrectly selected
Minevate solutions typically include:
Primary jaw crushers for maximum durability
Cone crushers or reinforced impact crushers for secondary and tertiary stages
2. Correct Crushing & Screening Plant Configuration
One of the most common mistakes in Africa & Middle East projects is:
“Oversizing capacity while underestimating system durability.”
Best Practice Configuration:
Large screening surface areas to prevent clogging
Wear-resistant liners and components
Modular layouts for easy maintenance
Minevate crushing & screening plants offer:
200 TPH to 600 TPH optimized capacities
Fixed, mobile and semi-mobile solutions
3. Sand Washing and Aggregate Plants – Water & Fines Management
Water availability is a critical factor in many African and Middle Eastern regions.
Efficient Process Design Includes:
Hydrocyclone + dewatering screen systems
Reduced fine material loss
Closed-loop water recovery solutions
Minevate sand washing plants ensure:
Lower water consumption
Higher final product quality
4. Concrete and Asphalt Plant Capacity Selection
Concrete Batching Plants
60, 120 and 180 m³/h capacity options
Operator-friendly automation with manual override
Thermal insulation and bunker design for hot climates
Asphalt Plants
160–240 TPH batch asphalt plants
RAP-compatible systems
Automation to optimize bitumen consumption
Minevate concrete and asphalt plants are engineered for continuous operation and long working shifts.
5. Advantages of Turnkey (EPC) Plant Solutions
Key risks in large-scale projects include:
❌ Multiple suppliers
❌ Integration issues
❌ Delays and cost overruns
Minevate’s turnkey EPC solutions cover:
Engineering & design
Manufacturing
Installation
Commissioning
All managed under a single technical responsibility.
🔹 Why Choose Minevate?
✔ Site-specific engineering solutions
✔ European-standard manufacturing
✔ Low operating and maintenance costs
✔ Proven references in Africa & Middle East projects
Call us today: +90 541 183 27 77